Trekking Itinerary

This morning we will drive to the village of Nale Moru for the starting point of the Rongai route. The first stage of the trek is through farmland and pine forests. You may have chance to see the beautiful Colobus monkeys or if you’re lucky enough, elephants or buffalos en route. Our first camp will be the Simba Camp located at the edge of the moorland zone at 2625m.

  • Distance covered: 8km / 5mi
  • Approx. time taken: 4hours – 5hours
  • Meals: Breakfast, Lunch & Dinner Included

The morning hike is a steady ascent up to the Second Cave Camp located in the moorland zone with superb views of Kibo and the Eastern ice fields on the crater rim.

  • Distance covered: 5km / 3.1mi
  • Approx. time taken: 3hours to 4hours
  • Meals: Breakfast, Lunch & Dinner Included

Leaving the pine forest behind, we carry on with a steady ascent walking though moorland. There are superb views of the Eastern ice fields on the crater rim of Kibo, the highest of the three volcanoes which form the mountain. We will leave the main trail and strike out across moorland on a smaller path towards the jagged peaks of Mawenzi, the second of Kilimanjaro’s volcanoes. We will set up camp today in the sheltered valley near Kikelewa caves at 3630m.

  • Distance covered: 5km / 3.1mi
  • Approx. time taken: 3hours – 4hours
  • Meals: Breakfast, Lunch & Dinner Included

Our day starts by descending into the Great Barranco, a huge ravine. We then exit steeply, up the Great Barranco Wall, which divides us from the southeastern slopes of Kibo. It’s a climb over rock, not technical, but long and tiring. Passing underneath the Heim and Kersten glaciers, we head towards the Karanga valley, which is our last stop for fresh water before the summit. Scree now forms the terrain as we walk through arid and desolate land towards Barafu camp.

  • Distance covered: 8km / 5mi
  • Approx. time taken: 4hours – 5hours
  • Meals: Breakfast, Lunch & Dinner Included

We leave our campsite and cross the lunar desert of the ‘saddle’ between Mawenzi and Kibo After a couple hours trekking, reach this spectacular place, with the summit of Kilimanjaro in the background and our trail to the high camp stretched out before our eyes. Upon reaching our camp the remainder of the day will be spent resting in preparation of the final ascent after a very early night!

  • Distance covered: 8km / 5mi
  • Approx. time taken: 5hours – 6hours
  • Meals: Breakfast, Lunch & Dinner Included

Today is “The Big Day” – the summit stage. You will begin your final ascent around midnight which will be long and strenuous. Passing the Hans Meyer Cave at 5220m, the climb slowly but surely goes upwards. At sunrise, you will reach Gillman’s Point (5681m) – the crater rim of Kilimanjaro – where the sun will slowly start to warm up the land. You will have soon forgotten the cold of the night and after a further hike of 1 – 2 hours, you will reach Uhuru Peak at 5895m. On your return to Kibo Hut, a warm meal awaits you followed by a 1 – 2 hour break before proceeding back down to Horombo Hut.

  • Distance covered: 22km / 13.7mi
  • Approx. time taken: 12 hours – 15 hours
  • Meals: Bed & Breakfast

The last stage passes through the heath and moor zone to the Mandara Hut (2700m) where a warm lunch is waiting for you. Soon, you will once again pass the tropical rainforest and after a total time of 6 hours trekking, you will be back at the Kilimanjaro National Park Gate (1860m). After saying goodbye to your mountain guides, a short transfer follows to take you back to your hotel in Moshi. Once there, you can take a warm and relaxing shower and celebrate your success in reaching the summit of the Kilimanjaro.

  • Distance covered: 20.8km / 12.9mi
  • Approx. time taken: 8 hours
  • Meals: Breakfast, Lunch & Dinner Included

DEPARTURE DATES

The departure dates for all our Trekking activities and tour packages are totally flexible according to your own personal needs. Please contact us for further and more detailed information.

Price Includes:

  • Professional mountain guides, cooks and porters
  • Pre & Post Trek accommodation
  • Pick up and drop off at Kilimanjaro international airport.
  • Transportation to & from the mountain gate
  • Park fees, camping fees & rescue fees
  • 18% VAT on tour fees & services
  • Double layered Sleeping Mats
  • 3 meals daily while on the mountain
  • Filtered water throughout the trek
  • Fair wages for the mountain crew as approved by the Kilimanjaro National Park Authority (KINAPA), Kilimanjaro Association of Tour Operators (KIATO)
  • Portable toilets and toilets tents.
  • Hot Water For Wash

Price Excludes:

  • International flights.
  • Expenses belong to person nature e.g Drinks not included on the meal plans, personal purchases, Laundry etc.
  • Cost of Visas.
  • Bank transfer charges & card payments processing fee.
  • Tips to mountain crew